News Flash Home
The original item was published from 12/21/2020 8:26:00 AM to 12/31/2020 9:08:05 AM.

News Flash

Road Closures / Detours

Posted on: December 20, 2020

[ARCHIVED] FDOT Broward County Traffic Impact Report December 18 - December 31

FDOT

Construction and maintenance-related lane closures on state highways in Broward County are expected during the week of December 18 - December 31. Due to the holidays, lane closures on most State roads will not occur December 24 through January 2, inclusive. Weather permitting, work will be done at the following locations throughout the county. For updated lane closure information, please refer to www.d4fdot.com. Follow us on Twitter @MyFDOT_SEFL, Facebook @MyFDOTSEFL, and Instagram @myfdot_sefl.

Current roadway construction projects underway in Oakland Park include:

Prospect Road Mobility Improvement Project from SR 870/Commercial Boulevard to SR 811/North Dixie Highway in Tamarac, Oakland Park and Fort Lauderdale


Learn more about the Prospect Road ’Complete Streets’ Project HERE.

Description: This project consists of widening Prospect Road from Commercial Boulevard to Powerline Road to accommodate 5-foot bike lanes in each direction and repurposing the outside travel lanes from Powerline Road to Dixie Highway to accommodate 7-foot buffered bike lanes in each direction. Improvements also include upgrading the existing roadway lighting to LED fixtures at the Powerline Road intersection, installing curb ramps to meet Americans with Disabilities Act (ADA) standards, performing minor drainage improvements, upgrading signage and pavement markings, and milling and resurfacing. For more information, contact Community Outreach Specialist Justina I. Hicklyn at (954) 482-4190 or justina@Valerin-Group.com

Cost/Completion: $4.6 million / late spring 2021 

Traffic Impact: 

  • One lane in each direction will be closed intermittently on Prospect Road from SR 870/Commercial Boulevard to NW 10th Avenue, 8:30 a.m. to 7:30 p.m., Monday, December 21, through Wednesday, December 23, and Monday, December 28, through Wednesday, December 30, for landscaping, signalization, paving operations, and manhole and valve adjustments. 
  • One lane in each direction will be closed intermittently on Prospect Road from SR 870/Commercial Boulevard to NW 10th Avenue, 9 p.m. to 6 a.m., Monday, December 21, through Wednesday, December 23, and Monday, December 28, through Wednesday, December 30, for paving operations. 
  • Two lanes in each direction may be closed on Prospect Road from NW 10th Avenue to Dixie Highway, 8:30 a.m. to 7:30 p.m., Monday, December 21, through Wednesday, December 23, and Monday, December 28, through Wednesday, December 30, for concrete work, landscaping, signalization, lighting, manhole and valve adjustments. 
  • Two lanes in each direction may be closed along Prospect Road from NW 10th Avenue to Dixie Highway, 9 p.m. to 6 a.m., Monday, December 21, through Wednesday, December 23, and Monday, December 28, through Wednesday, December 30, for paving operations. 
  • One lane in each direction will be closed Monday, December 21, through Wednesday, December 23, and Monday, December 28, through Wednesday, December 30, along Prospect Road from NW 10th Avenue to Dixie Highway, for concrete work, landscaping, signalization and lighting, paving operations, manhole and valve adjustments. 

NW 21st Avenue Mobility Improvement/Bridge Replacement Project in Oakland Park, Tamarac and Fort Lauderdale


Description: This project will take place along NW 21st Avenue from SR 870/Commercial Boulevard to SR 816/Oakland Park Boulevard. The project consists of adding 5-foot buffered bike lanes in each direction and replacing the existing bridge over the South Florida Water Management District C-13 Canal. Improvements will also include upgrading signalization at NW 39th Street and NW 44th Street, installation of sidewalks and curb ramps with Americans with Disabilities Act (ADA) improvements, milling and resurfacing, and upgrading signing and pavement markings. For more information, contact Community Outreach Specialist Justina I. Hicklyn at (954) 482-4190 or justina@Valerin-Group.com

Cost/Completion: $7.2 million / winter 2021 

Traffic Impact: 

  • One lane in each direction will be closed intermittently along NW 21st Avenue from Commercial Boulevard to Oakland Park Boulevard, 9:30 p.m. to 6 a.m., Sunday, December 20 through Wednesday, December 23, for milling, resurfacing and final pavement markings.

Prospect Road Complete Streets Project Page
Facebook Twitter Email

Other News in Road Closures / Detours

Traffic advisory news item

FPL Project on Park Lane East

Posted on: January 26, 2023
Traffic advisory news item

FPL Project on Park Lane East

Posted on: January 26, 2023